NASA Integration and Testing Complex

Client: NASA
Project:NASA Integration and Testing Complex

Project Information

EBL provided mechanical, electrical, plumbing and fire protection engineering services for improvements to the NASA Integration and Testing complex. The NASA I&T facility includes the 1.3 million cubic foot Spacecraft Systems Development and Integration Facility (SSDIF), the largest clean room of its kind.

Our tasks included designs for the replacement of building electrical switchgear; replacement of multiple critical environment air handling units, control sequence and system improvements, fire alarm and sprinkler system modifications; rain water conductor repair/replacement; and foundation drain/waterproofing improvements.

For the SSDIF Clean Room, we produced design documents for the replacement of primary dehumidification and pressurization air handling units; controls upgrades; replacement of six 200 hp primary circulating fan motors and VFDs; and evaluated and enhanced the primary cooling coil wall functionality.

All work was coordinated and sequenced to maintain mission continuity with zero interruptions at the facility, which operates on a 24 hours per day, 365 day per year schedule.